| Chocolate Counter
The Secret Chocolate
Shop Leigh-on-Sea Essex |
Working directly with the Client to
design and supply a chocolate display counter. Including spray lacquered
base and bonded toughened glass display. |
 |
Hulk Installation Structural Works
Mme Tussauds London |
Having been instrument in the design of
Mme Tussauds "Hot Spot" enclosure, 2TA was employed directly by Mme
Tussauds to design, source and manage the structural modifications
necessary for their "Hulk" installation. |
 |
| Bar
Wolfson College Cambridge
|
Working for Bowller Group
Ltd - Interiors division, 2TA surveyed, detailed, set out, managed and
installed a curved bar complete with back fittings. |
 |
| Dental Surgery Refurbishment
Hockley
Dental Surgery
Hockley Essex
|
Working directly with the Client to
design, source and implement the complete refurbishment of the Surgery,
reception and office areas including:-
- Counter
- Decoration
- Ceiling
- Lighting
- Feature Lighting
- Flooring
- Full Height Glass Partitions
- Glass block walls
- Feature Radiators
|
 |
|
Coach House Conversion
Freckenham Manor
Freckenham
Sufolk |
Working for Bowller
Group Ltd - Interiors division 2TA surveyed, detailed, set out
and managed the conversion of an 18th Century coach house to provide a
spacious first floor flat for the Manor house keeper. |
 |
|
Office Refurbishment
Enterprise Rent-a-Car
Norwich
Norfolk |
Working for Bowller
Group Ltd - Interiors division, 2TA
provided on site management for the
complete fitting out of Enterprise Rent-a-Car offices and showroom in
Norwich. Services provided by
2TA also included the sourcing and purchase of significant material
elements for the project. |
|
|
Office Refurbishment
Cambridge County Council
Mount Pleasant Cambridge |
Working for Bowller Group
Ltd - Interiors division, 2TA
provided on site management for the complete re-fit of
the first floor offices of Cambridge County Council Mass Transit
Division. |
|
|
Disco Enclosure
Wolfson College Cambridge
|
Working for Bowller Group Ltd - Interiors
division 2TA surveyed, detailed, set out, managed and installed a disco
station inclusive of vinyl padded enclosure hiding the unit away when
not in use. |
 |
Hulk Removal Structural Works
Mme Tussauds London |
Following the "Hulk"
installation 2TA was again employed to manage the reinstatement of
the Hot Spot enclosure for the Johnny Wilkinson exhibit. This included
replacing themed damaged ceilings and columns and reinstalling the
structural steelwork previously removed to allow clearance for Hulk |
 |
Cafe Refurbishment
Mme Tussauds London |
2TA was employed directly
by Mme Tussauds to develop the design studios brief, provide details and
manage the refurbishment of their exit cafe. Due to the location
of this facility all works were undertaken outside normal opening hours.
|
 |
Spiderman Shop & Themeing
Mme Tussauds London |
2TA was
employed directly by Mme Tussauds to develop the design studios brief,
provide details and manage the refurbishment of their
retail area and themeing elements
relative to the Spiderman exhibit. |
 |
Information
Desk
Mme Tussauds London |
2TA
designed, detailed and executed the
revision and extension of Tussauds VIP entrance information desk. Works
also included the sourcing of discontinued laminates to match the
existing fittings. |
 |
Maintenance Workshop
Freshfield Bruckhause
Deringer
Fleet Street London |
Design, management and
implementation of the refurbishment of Freshfields maintenance workshop.
Including, lighting, extension of electrical services, sourcing and
installation of machines, extraction system and benches and storage. |
 |
M&S Bakeries 2005
Marks & Spencer
Watford
Newcastle
Milton Keynes
Birmingham
Kensington
|
2TA was commissioned by TAG Retail to undertake the
project management of their in store bakery installations.
Works included site surveys; development of layout and service drawings; component design development;
liaison with Principal Contractors and Clients representatives;
production of Risk Assessments, Method Statements and O&M Manuals; programming and supervision of site installations.
In addition to the installation of fixtures and fittings this also included a cold room, plumbing,
electrical and refrigeration installations on all sites.
|
 |
Music Shop
Music Room
Nottingham |
2TA was commissioned by TAG Retail to undertake the project management
of the fit out of a bare shell shopping centre unit.
Works included site surveys; development of layout and service drawings;
cost control; component design development;
liaison with Shopping Centre and Client;
production of Risk Assessments, Method Statements and O&M Manuals; programming and supervision of site installations.
To further speed the installation 2TA Ltd provided many of the
supplementary materials at a turn key package. |
|
High Street Bakery
Mathiesons
Cow Wynd
Falkirk |
2TA was commissioned by TAG Retail to undertake the project management
of the fit out of an old two storey high street shop.
Works included site surveys; development of layout and service drawings;
cost control; component design development;
liaison with Local Authorities and Client;
production of Risk Assessments, Method Statements and O&M Manuals; programming and supervision of site installations.
To further speed the installation 2TA Ltd provided many of the
supplementary materials at a turn key package. |
 |
Oak Glazed Screens
St Andrews Church
Rochford
Essex |
2TA was nominated by the project Architect to supply and install 2 Nš glazed oak screens within existing
archways together with an oak external door.
2TA worked with the Architect in finalising the design of the screen, and door, and provided computer generated 3D images to
assist in submissions to Local Authorities and English Heritage.
The screen employed unbalanced double glazed units to assist in sound
attenuation and featured acoustic seals throughout
Installation was particularly challenging due to the height and weight of the screens.
|
 |
Cafe Outlet
Mathiesons
The Gyle
Edinburgh |
2TA was commissioned by TAG Retail to undertake the project management
of the refit of shopping centre food outlet
Works included site surveys; development of layout and service drawings;
cost control; component design development;
liaison with Centre Management and Client;
production of Risk Assessments, Method Statements and O&M Manuals; programming and supervision of site installations.
To further speed the installation 2TA Ltd provided many of the
supplementary materials at a turn key package. |
 |
M&S Bakeries 2006
Marks & Spencer
Croydon
Bluewater
Cribbs Causeway
Reading
Lisburn
Dublin
Handforth
|
Following the success of the 2005 installations
2TA was again commissioned by TAG Retail to undertake the
project management of their 2006 in store bakery installations.
While the design had been refined the spread of the sites (including two
locations in Ireland) maintained a challenge for the Team. |
 |
Domestic Extension
Hockley
Essex |
2TA Ltd undertook the full project, from production of drawings for
approval through to internal finishes. The project included the
demolition of an existing garage and provision of a new enlarged
garage with office space above.
Planning approval proved particularly challenging, ultimately requiring
three submissions prior to obtaining acceptance.
Extensive use of CAD 3D Imaging ensured optimum use of internal
space.
|
 |
M&S Cafe Revive
Marks & Spencer
Bury St Edmunds
&
Enfield
|
2TA was commissioned by TAG Retail to undertake the project management
of two Cafe Revive installations.
Works were in the same vein as the M&S Bakeries although encompassing
larger areas and including decoration works in addition to the
installation of fittings, equipment and services.
In addition to Bury St Edmunds & Enfield 2TA also provided the O&M
Manuals for Bluewater |
 |
Cheese Shop
The Teddington Cheese
Richmond
|
2TA is providing a turn key fit out for The Tedding Cheese Company
converting a bare shell shop unit into a new specialist Cheese shop.
In addition to services, decorations and fittings the unit also requires
a new Cold Room, air conditioning and refrigeration services
Significant time has been spent in ensuring the design is exactly as the
Client requires and full CAD 3D modelling has proved invaluable in this
respect. |
 |